ADU Company in Pedley — Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates

ADU Company in Pedley, CA

Kitchen remodeling in Pedley usually means working inside a mid-century ranch on a large lot, where the original footprint was built for a different era and the summer heat punishes any room without proper ventilation. Most homes here were framed before modern kitchen layouts existed, so we spend a lot of time opening walls, relocating appliances, and correcting decades of ad-hoc updates. Sunburst ADU Builders handles the full scope, from demolition to finished cabinetry, on one contract. If you’re planning a kitchen remodel or an attached ADU with a full kitchen, call (855) 676-6807 for a free estimate.

Call (855) 676-6807

Why Pedley Homes Are Different

Pedley is an unincorporated Riverside County community, not a city, so every kitchen remodel here goes through Riverside County’s building department rather than a municipal permit counter. That changes the paperwork, the inspection schedule, and sometimes the design itself. The housing stock is dominated by single-story ranch and rural-residential homes built mid-century, many with detached garages, carports, and outbuildings that date from the same era as the original kitchen. Those homes were framed with 2×4 walls, minimal insulation, and electrical panels that were sized for a 1960s appliance load, not a modern kitchen with induction cooktops, double ovens, and dedicated circuits for refrigeration. When we open a Pedley kitchen wall, we typically find original wiring, no exhaust ducting to the outside, and a layout that was designed around a freestanding range and a single sink.

The climate adds a second layer. Pedley sits in the hot, dry Jurupa Valley basin, where July and August afternoons routinely pass 100°F. A kitchen remodel here is not just about cabinets and countertops. It is about sizing the HVAC return, adding a properly vented range hood so the cooktop is not dumping heat and grease into an already warm room, and choosing finishes that do not warp in low humidity. Santa Ana wind events push dust into every open wall cavity, so we schedule demolition and rough-in work with an eye on the forecast. These are the details that make a Pedley kitchen job different from one in a coastal city or a newer tract development.

Our Main Pedley Services

Most Pedley homeowners call us about two things: building a detached ADU on their oversized lot, or remodeling a bathroom inside the primary home. Both go through the same county process, and both benefit from working with one team that understands the 92509 parcel patterns.

ADU Builders in Pedley

Pedley lots are often large enough for a truly detached unit with its own pad, separate driveway, and long utility trench back to the main house. That is a different project from a garage conversion, and it comes with questions about septic capacity, electrical panel upgrades, and county setback rules. We handle the full scope, from foundation to finished interior, working across prefab and modular platforms as well as traditional stick-built construction. See ADU Builders in Pedley for the full breakdown of how we approach these projects.

ADU Builders in Pedley

Bathroom Remodeling in Pedley

Bathrooms in Pedley’s older homes tend to be small, original to the house, and short on ventilation. A remodel here often means reconfiguring the footprint, replacing cast-iron drain lines, adding an exhaust fan that actually vents outside, and bringing the electrical up to current county code. When the bathroom is part of a new ADU, we build it from the slab up with moisture-resistant materials and proper airflow for the Jurupa Valley heat. Read more at Bathroom Remodeling in Pedley.

Bathroom Remodeling in Pedley
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (855) 676-6807

What happens when you call

  1. 1
    A real person answersNo phone trees — you reach a local pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched.
  3. 3
    A background-checked tech heads outLicensed & insured, dispatched right away.
  4. 4
    You approve before work beginsNothing starts until you say go.

Kitchen Remodeling in Pedley

Kitchen Remodeling in Pedley

Kitchen remodeling in Pedley typically costs between $35,000 and $85,000 for a full renovation, depending on whether you are reconfiguring the layout, moving plumbing, or keeping the existing footprint and refreshing surfaces. Homes here were mostly built between the 1950s and 1970s, so the work often includes correcting outdated wiring, adding exterior-venting exhaust, and rebuilding the space around how a modern family actually cooks. For a broader look at what a kitchen remodel involves, see our Kitchen Remodeling service hub before you start comparing bids.

Full Kitchen Gut and Reconfiguration

Signs you need it

Your kitchen has one small counter workspace, a range pushed against a corner, no exhaust hood, and the refrigerator blocks a doorway every time the door swings open.

What it costs in Pedley

A full gut and reconfiguration in Pedley typically runs $55,000 to $85,000, with the high end reflecting structural changes, new electrical circuits, and custom cabinetry.

How we do it

We strip the room to framing, correct any structural or wiring issues, relocate plumbing and gas lines per the new layout, then rebuild with new drywall, flooring, cabinetry, counters, and a properly vented hood.

Kitchen Refresh with Existing Layout

Signs you need it

The layout works fine but the cabinets are peeling, the countertops are worn, the sink leaks, and the flooring shows decades of traffic.

What it costs in Pedley

Keeping the existing footprint but replacing cabinets, counters, flooring, sink, and lighting generally lands between $35,000 and $50,000 in Pedley.

How we do it

We pull the old cabinets and counters, replace any damaged drywall or subfloor, install new base and wall cabinets, set new countertops, hook up the sink and appliances, and patch and paint the room.

What Kitchen Remodeling Costs in Pedley

Item Typical range in Pedley
Full gut and reconfiguration $55,000 – $85,000
Kitchen refresh with existing layout $35,000 – $50,000
Cabinet, counter, and sink replacement only $20,000 – $35,000

How long does a kitchen remodel take in Pedley?

Plan on six to ten weeks for a full gut and reconfiguration, and three to five weeks for a refresh. County inspections add a few days at each stage, but they rarely extend the schedule more than a week total.

Will the price change once work starts in Pedley?

Only if the walls reveal something the county requires us to fix, like aluminum wiring or a failed drain line. We write the scope before we open walls, document any change orders in writing, and never start added work without your sign-off. Call (855) 676-6807 for a fixed line-item quote.

Brands We Service in Pedley

We work with Cover, Dvele, and Mighty Buildings on ADU projects across Pedley, and we specify James Hardie fiber-cement siding for exterior finishes that hold up in the Jurupa Valley sun and wind. We stock common parts and finishes locally, which keeps most material-related delays to a few days. Learn more on our brands page.

Pricing for ADU Company in Pedley, CA

Service Typical range in Pedley
Full kitchen gut and reconfiguration $55,000 – $85,000
Kitchen refresh with existing layout $35,000 – $50,000
Cabinet, counter, and sink replacement only $20,000 – $35,000
Detached ADU, site-built (400 – 600 sq ft) $180,000 – $280,000
Detached ADU, prefab or modular $140,000 – $230,000
Garage conversion ADU $90,000 – $160,000
Prefab ADU (studio, 300 – 500 sq ft) $80,000 – $150,000
Modular ADU (600 – 1,000 sq ft) $160,000 – $300,000
Bathroom remodel (hall or guest bath) $15,000 – $30,000
Bathroom remodel (primary bath) $25,000 – $55,000
Bathroom addition (new, 50 – 70 sq ft) $35,000 – $65,000

In Pedley, the big price drivers are septic capacity reviews on parcels not connected to municipal sewer, long utility runs from the house to a detached unit, and electrical panel upgrades on older ranches. You get a written line-item quote before we start, and we do not change the price unless you approve a change order in writing.

Neighborhoods We Serve in Pedley

We work throughout the 92509 zip code, from the residential streets off Limonite Avenue to the larger parcels along Pedley Road and the flatlands east toward the Santa Ana River. Every neighborhood has slightly different parcel sizes and setback realities, but the same county rules apply across the board.

  • Pedley Road corridor
  • Limonite Avenue area
  • Granite Hill neighborhood
  • Van Buren Boulevard stretch
  • Santa Ana River bottom parcels

We schedule most estimates in Pedley within a few business days, and our crews are already working in the 92509 area on a regular basis.

Service Area – Cities Near Pedley

From our base in Highland, we serve Pedley and the surrounding Jurupa Valley basin communities. You will find our ADU and remodeling crews in Glen Avon, CA, Sunnyslope, CA, Rubidoux, CA, and Riverside, CA. If you are just outside Pedley, the closest city page will give you the same level of local detail for your area.

Serving Pedley, CA — Our Local Coverage Area

We’re based in the Pedley area and know this community well. Use the map below to see our service coverage — if you’re nearby, we can almost certainly help.

FAQs About ADU Company in Pedley

Ready to get started? Free estimates · Written quotes before work starts response in Pedley
Call (855) 676-6807

What happens when you call

  1. 1
    A real person answersNo phone trees — talk to a local adu pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you — the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Pedley Customers Say

★★★★★ 4.8 from 4+ reviews

"Detached unit in the back yard. Utilities trenched, separate meter, and it passed final on the first inspection."

— Hector Torres

"Unit came out great and the tenant is happy. The timeline ran long, largely because of how slow the city was on plan check, though a couple of the delays were scheduling on their end."

— Jodi Reed

"He was honest that our lot had a slope problem that would add real cost, before we signed anything."

— Katie Parker

How It Works in Pedley

Getting your adu handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your adu needs and we provide an upfront, transparent quote — no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Pedley — typically within 30–60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

Request a Free Estimate

Tell us what's going on in Pedley — we'll get back to you fast. No obligation.

By submitting this form, you acknowledge our Privacy Policy and consent to being contacted through phone, text, or email concerning your request, including by the partner businesses that may perform the service.

Prefer to text? Text Us
Call Now - 24/7 Dispatch
Areas We Serve
Call Now - 24/7 Dispatch